enkidec@enkidec.com Monza · Bozzolo, Italy Mon–Fri 8:00–18:00 CET
Biogas digesters in the countryside
Consulting, design and permitting
Key takeaways

A biomethane plant produces renewable gas by anaerobic digestion followed by upgrading to over 97% methane. Success depends on permitting (6–12 months in Italy), stable revenues (incentives and BPAs) and energy efficiency, improved with solar PV and heat pumps.

>97%methane after upgrading
6–12 monthstypical permitting time
~60 BPAsindustrial contracts signed in Italy in 2026

How a plant works

Feedstock (manure, crop residues, agro-industrial by-products, food waste, sludge) → anaerobic digestion (mesophilic ~37 °C or thermophilic ~55 °C) → biogas cleaning → upgrading (membranes, PSA, scrubbing) → grid injection or bio-LNG, plus biogenic CO₂ recovery and digestate management.

What we do

Feasibility and business plan, permitting, layout and PV/BESS integration, construction management and start-up, odour control, incentives and Biomethane Purchase Agreements.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
Can an existing biogas plant be converted to biomethane?

Yes, by adding upgrading and reviewing the energy balance, often with solar PV replacing CHP self-supply.

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.