Industrial wastewater treatment plant with aeration tanks
We design and build
Key takeaways

An industrial wastewater plant is designed in four steps: characterisation (flows, loads, variability), treatment train selection (pre-treatment, physico-chemical, biological, polishing), compliance check against discharge limits and BAT-AELs, and an operating plan for sludge, chemicals and energy.

24 hflow-weighted composite sampling
50–70%footprint saved by MBR vs activated sludge
60–90%water recoverable with membrane polishing

When you need a dedicated plant

When discharge to sewer or surface water does not meet the limits, when sewer charges for high pollutant loads are high, when the permit imposes new limits or, increasingly, when you want to recover water to reduce abstraction during droughts.

How we design it

  1. Characterisation: average and peak flows, COD, BOD5, TSS, nitrogen, phosphorus, surfactants, oils, metals and sector-specific parameters, over 24-hour composite samples and production cycles.
  2. Water and mass balance: often the best solution is to segregate streams and treat them differently.
  3. Treatment train: pre-treatment, physico-chemical (coagulation, DAF, lamella settling, Fenton), biological (activated sludge, MBBR, MBR, SBR, anaerobic), polishing (sand filters, activated carbon, UF, reverse osmosis) and sludge dewatering, compared on CAPEX, OPEX, energy, chemicals, sludge and footprint.
  4. Permitting: limits from national law, utility regulations and, for IED installations, BAT-AELs, which the revised Industrial Emissions Directive pushes towards the strictest end of the range.

Sectors

Food and beverage, chemicals and pharma, textiles and tanning, paper, metal finishing, plastics, cosmetics, logistics and landfill leachate.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
How much does an industrial wastewater plant cost?

It depends on flow, load and target quality. With flows and analyses we prepare a CAPEX estimate and an operating cost per cubic metre for two or three configurations.

Can production continue during construction?

Yes, in almost every case, with temporary bypasses, phased works and progressive start-up.

Can the plant also enable water reuse?

Yes, by adding a polishing stage (UF, RO, disinfection) the effluent can go back to washing, cooling or process uses.

Insights

Related articles

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.