enkidec@enkidec.com Monza · Bozzolo, Italy Mon–Fri 8:00–18:00 CET
Existing wastewater plant being revamped
Key takeaways

A revamp starts with a process diagnosis on real data, finds bottlenecks and proposes graded measures: operational optimisation, equipment upgrades, process conversion (MBBR/IFAS, MBR, SBR) and new stages. Aeration, 50–60% of energy use, is usually the first target.

50–60%aeration share of power use
×1.5–2typical capacity gain in same volumes
0 downtimegoal during works

Method

Diagnosis with one year of operating data and energy audit → bottleneck analysis → graded measures (operational, equipment, process, new stages, sludge line) → phased works without service interruption → before/after KPI verification.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
Can capacity increase without new tanks?

Often yes, with MBBR/IFAS or MBR.

Insights

Related articles

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.