enkidec@enkidec.com Monza · Bozzolo, Italy Mon–Fri 8:00–18:00 CET
Aerial view of a treatment plant under design validation
Key takeaways

We check completeness, internal consistency, technical correctness, compliance and buildability, closing with a formal verification report.

checklistfor every document
reportformal verification
3rd partyindependent from the designer

Scope

Completeness, consistency between reports, calculations, drawings and bill of quantities, process sizing, compliance, buildability and costs.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
Who can validate a design?

A party independent from the designer with the right expertise.

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.