Industrial wastewater plant during start-up
Key takeaways

We take plants from first water to steady state: pre-commissioning, seeding and acclimation, tuning, optimisation and operator training.

2–12 weekstypical for biological plants
25+ yearsstart-up experience
SOPshanded over

Scope

Pre-commissioning, biological seeding and load ramp-up, membrane conditioning, digester heating and loading, optimisation of air, energy and chemicals, SOPs and training.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
Do you start up plants designed by others?

Yes, after a review of documentation and plant condition.

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.