enkidec@enkidec.com Monza · Bozzolo, Italy Mon–Fri 8:00–18:00 CET
Reclaimed water ready for industrial reuse
Key takeaways

A reuse project has five phases: water balance, feasibility with independent technology choice (MBR, UF, RO, disinfection, evaporation for ZLD), risk management plan and permitting under Regulation (EU) 2020/741 and Italy's new reuse decree, contracts and finance, design and start-up.

~4%treated wastewater reused in Italy today
~17%estimated reuse potential
MVRlow-energy evaporation for ZLD

Treatment trains

  • Washing, irrigation: filtration + UV (90–100% recovery)
  • Cooling: MBR or UF (+ softening) (80–95%)
  • Process water: MBR/UF + reverse osmosis (60–80%)
  • ZLD: membranes + MVR evaporator + crystalliser (~100%)

Why now

Droughts in the Po basin, the EU Water Resilience Strategy (10% efficiency target by 2030) and Italy's new risk-based reuse decree covering industrial uses.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
How much water can be recovered?

From 60% up to almost 100% with ZLD, depending on quality and salinity.

Insights

Related articles

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.