Wastewater plant subject to environmental permit
Key takeaways

In Italy the permit depends on activity and size: AUA for SMEs, AIA (integrated permit, IED installations), EIA for listed projects and discharge consents. The revised IED, transposed by Legislative Decree 197/2026, brings stricter BAT-based limits, a mandatory environmental management system and water and resource performance levels.

90–150 daystypical AUA timeline
LD 197/2026IED 2.0 transposition
1 contactfrom application to permit

How we work

Scoping of the permit route, gap analysis, technical reports and water balances, monitoring plans and BAT sheets, submission and follow-up of requests, services conferences with Province, Region, ARPA and the water utility, and post-permit compliance.

Foreign investors benefit from an English-speaking technical lead who handles the Italian procedure end to end.

Pipework of a water treatment plant
FAQ

Frequently asked questions

Answers to the questions plant managers, engineering and HSE teams ask us most often.

Request a consultation
What is the difference between AUA and AIA?

AUA bundles sector permits for SMEs and non-IED plants; AIA is the integrated permit for IED installations, based on Best Available Techniques.

Insights

Related articles

Insights

Related services

Follow ENKIDEC on LinkedIn

Weekly insights on regulation, technologies and real projects in water, wastewater and biomethane.

Follow on LinkedIn
Next step

Do you have a plant to design, permit or bring back to performance?

Tell us about it in a 30-minute call: we will tell you where to start, which data you need and which options to compare.